Certification Report Weekly Summary No. 26
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AssOCi~2~tes <br />October 16a', 2001 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Weekly Summary No. 36: October 7 through October 13, 2001 <br />Cresson Project Phase IVa, b, and c Construction Quality Assurance <br />Deaz Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this weekly summary of Phase Na, b, and c <br />Construction Quality Assurance (CQA) services performed for the Cresson Project during the period of <br />October 7`s through October 13`s, 2001. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low temperatures <br />• ranged from 21° F to 38° F, and highs ranging from 47° F to 62° F. Light snow flumes were recorded <br />on October 12`s. Weather observations were made on six days of this seven-day reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthwork contractor for the Phase Na, <br />b, and c construction. Ames conducted Phase IVa, b, and c construction activities on five days of <br />this seven-day reporting period (October 8a' through October 12w). <br />PhaseIVa <br />Ames continued Structural Fill cut and fill activities in the central portion of the Phase Na footprint, <br />above the previously constructed secondary underdrain. Caterpillar D10 dozers and a Caterpillar D8 <br />dozer removed material from cut areas to the south and placed SF materials north over the existing <br />underdrain into loose lifts not exceeding 2 feet in thickness. A Caterpillaz CS563C roller provided <br />compactive effort, while a Mack or a Caterpillar water wagon provided moisture conditioning when <br />needed or required. <br />Ames continued SF placement and compaction activities in the northern portion of the Phase IVa <br />footprint, in the Arequa Gulch area. One Caterpillaz DIO cut previously placed SF and blasted rock <br />SF from the central portion of the Phase Na azea to a stockpile where a Caterpillar 375 track hoe <br />U <br />Golder Associates Inc. <br />44 Union Boulevard, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303) 985-2080 <br />Golder Associates Inc. <br />