Phase IV Weekly Summary No. 35 Page 2 003-2203 <br />The material was then hauled to the Arequa Gulch fill azea. SF materials were placed in the fill azeas <br />in horizontal lifts typically not exceeding 1 foot in loose thickness. A Caterpillar C5563C roller <br />provided compactive effort, while a Caterpillaz water wagon provided moisture conditioning when <br />needed or required. <br />Ames continued and completed construction of a small extension of the secondary underdrain, east <br />of the previously constructed underdrain, to facilitate SF construction upslope. Several laborers <br />completed clean out of the excavated trench, lapped the existing geotextile azound the underdrain fill <br />(UF), and spread Select Structural Fill (SSF) above the underdrain. A Caterpillar 9661oader placed <br />the OF and SSF materials prior to manipulation by the laborers. <br />Ames continued SF placement and compaction activities in the northern portion of the Phase IVa <br />footprint, in the Arequa gulch azea. Caterpillar 777 haul trucks brought SF material from the cut <br />area (mentioned above), while a Caterpillaz D8 placed and spread the material into loose lifts not <br />exceeding 2 feet in thickness. Oversize material within the fill was removed by the dozer and placed <br />in the uncontrolled fill azea located northeast of the fill. A Caterpillar CS563C roller provided <br />compactive effort, while a Caterpillaz water wagon provided moisture conditioning when needed or <br />required. <br /> <br />Ames performed blast-drilling activities on Monday through Friday during this reporting period, in <br />the central portion of the Phase IVa area. Blasting occurred Monday, Tuesday, Thursday, and <br />Friday during this reporting period. <br />Phase IVb <br />Ames continued and completed placement of Compacted Ore Fill (COF) within the limits of the <br />LOB construction area. The material was brought in by Caterpillar 777 haul trucks, spread by <br />Caterpillaz D7 and D8 dozers into loose lifts approximately 1 foot in thickness, and compacted by a <br />Caterpillaz CS563 roller (Minimum of 8 passes). A Caterpillaz water wagon provided moisture <br />conditioning of the material when needed. <br />Ames did not perform any drilling activities associated with the Phase IVb construction azea. <br />Phase IVc <br />Ames did not perform any drilling activities associated with the Phase IVc construction area. <br />Ames did not perform any cut or fill activities within the Phase IVc azeas during this reporting <br />period. <br />(See Attachment A for approximate construction locations for all Phase N areas.) <br />rwe rv.~s s~uaona.~~ Golder Associates lnc. <br />