Doc Date
9/3/2002
Doc Name
Certification Report Weekly Summary No. 26
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IV Weekly Summary No. 32 Page 2 <br />003-2203 <br />roller provided compactive effort, while a Caterpillar water wagon provided moisture conditioning <br />when needed or required. <br /> <br /> <br />Confirmation drilling was performed on underground working UG-545. Boreholes 1 through 8 were <br />drilled for UG-545 to delineate a possible lateral in an east-west direction underneath the ADR haul <br />road. Drillin~ for UG-545 is complete to date, with all grouting and surveying finished as of <br />September 12 Remediation of UG-545 will be completed at a later date. <br />Phase IVb <br />Ames continued transporting Soil Liner Fill (SLF) material to the LOB using two Caterpillar 777 <br />haul tracks. A Caterpillaz D-8 dozer and a Caterpillar 14G motor grader were used to roughly <br />spread and compact the material to a loose depth of approximately 1.3 feet. A laborer was present to <br />make certain no debris or deleterious material was present in the fill and to account for all the rebaz <br />stakes used for depth control, ensuring they did not become buried in the fill. Most of the SLF <br />placed and compacted in the LOB azea was finish rolled by September 15`h <br />Polyflex began deployment and welding of geomembrane in the Phase IV LOB azea on Saturday, <br />September 15`", late in the afternoon. Polyflex began deployment at the southeast corner of the LOB <br />liner azea, deploying geomembrane (80-mil textured LLDPE). Eleven panels total were fusion <br />welded on the east inboazd slope during this reporting period. A total of approximately 24, 020 ftz of <br />geomembrane was placed during this reporting period. <br />Ames completed slope re-contouring located to the north of the new LOB location to form the bench <br />for the geomembrane anchor trench. A Caterpillar 375 excavator and a Caterpillaz D-8 dozer were <br />used to excavate and load the material onto 777s for use as Structural Fill (SF) or uncontrolled fill. <br />Work continued on assorted small fills and grading of SF subgrade in the general area. <br />No confirmation drilling was performed in this azea during this reporting period. <br />Phase IVc <br />Ames did not perform any cut or fill activities within the Phase IVc areas during this reporting <br />period. <br />(See Attachment A for approximate construction locations for all Phase IV areas.) <br />Field Monitorine and Testine Activities <br />Golder observed construction activities associated with Phase IV earthworks. All construction <br />materials and soil materials were verified as suitable and construction methods were in accordance <br />with project specifications. Removal of oversized and deleterious material from all fill areas was <br />observed. <br />Golder monitored and documented depth checks on in-situ SLF at the LOB pad. All checks <br />indicated a compacted depth of 12 inches or greater. All locations were marked and located by <br />rn~~rv.3z s«m-sepmsm~ Golder Associates lnc. <br />