Certification Report Weekly Summary No. 26
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IV Weekly Summary No. 32 Page 3 003-2203 <br />Ames surveyors. Golder also performed nucleaz moisture density testing of SLF at the LOB pad. A <br />summary of field moisture-density testing and laboratory testing during this reporting period is <br />presented in Attachment B. <br />Golder observed the Phase IVa secondary underdrain construction for correct dimensioning as per <br />specifications of four foot in width and two foot in depth to accommodate materials. Twelve-ounce, <br />was installed prior to the installation of 12-inch minus underdrain fill. The geotextile was then <br />wrapped over the underdraln fill as six inches of three-inch maximum-sized SSF material was <br />installed over the geotextile. The trench measured approximately 453 feet in length, commencing at <br />Highway 67 and following the natural topography to termination within 20 feet of the existing ADR <br />road. The tie-in between the proposed primary underdrain and the aforementioned secondary <br />underdrain will be constructed at a later date. <br />Golder observed and recorded confirmation drilling and remediation of underground workings in the <br />all Phase IV azeas during this reporting period. <br /> <br />• <br />Golder monitored and documented geomembrane installation. Golder observed panel deployment, <br />including panel thickness measurements and mazking defects. Golder monitored and documented <br />trial seam tests, seaming, seam pressure tests, vacuum testing, patching, and identified fusion seam <br />destructive samples and extrusion seam destructive sample for testing by Polyflex. Prior to <br />geomembrane arriving on site, Golder conducted MQA conformance testing on material <br />manufactured for the LOB construction. Golder performed one conformance test that met project <br />specification. <br />Laboratory Test Results <br />Golder collected one OF soil sample and one SSF soil sample and performed index testing <br />associated with the Phase IVa secondary underdrain construction, results of the laboratory tests aze <br />presented in Attachment B. Golder performed laboratory testing of one SLF soil sample, collected <br />the previous week, and is presented in Attachment B. <br />Meetines <br />CC&V held a Weekly Contractor meeting on September 11th. Items discussed include Safety, <br />Environmental, Schedule, and CQA. The next weekly meeting will be held on September 18`h, <br />2001 at 10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment C. <br />Phew Ne 33 Sept9-SeptlS doc Golder Associates Inc. <br />