Certification Report Weekly Summary No. 26
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IV Weekly Summary No. 3l Page 2 <br />003-2203 <br />passes over the entire surface of each lift. The material consisted of large rocks, sandy gravel with <br />some silt and clay. The non-rock portion was generally moist. <br />• Confirmation drilling and/or excavation remediation was performed on underground workings UG- <br />460 and UG-461. Boreholes 1 through 6 were drilled for UG-461 to delineate a possible lateral in <br />the direction of the Phase IVa. Drilling for UG-46] is complete with all grouting and surveying <br />finished as of September 7d'. Backfilling and compaction activities associated with UG-460 and <br />UG-461 were also completed on September 7a'. An Ames Caterpillaz 330B track-hoe filled the two <br />workings with structural fill into loose lifts not exceeding approximately three feet in thickness. The <br />fill was compacted using either the track-hoe bucket or the Caterpillar 563 vibratory roller. <br />Phase IVb <br />Ames began transporting Soil Liner Fill (SLF) material to the LOB using two Caterpillaz 777 haul <br />trucks. A Caterpillar D-8 dozer and a Caterpillar 14G motor grader were used to roughly spread and <br />compact the material to a loose depth of approximately 1.3 feet. A laborer was present to make <br />certain no debris or deleterious material was present in the fill and to keep account of all the rebaz <br />stakes used for depth control, ensuring they did not become buried in the fill. A portion of the fill <br />azea was rolled on September 3rd as a temporary measure to protect from rain. <br />Ames performed slope recontouring located to the north of the new LOB location to form the bench <br />for the geomembrane anchor trench. A Caterpillar 375 excavator and a Caterpillar D-8 dozer were <br />used to excavate and load the material onto 777s for use as Structural Fill. Ames continued to blade <br />and compact the SLF surface, excluding the north slopes. Six depth checks of the in-situ SLF were <br />• performed by the contractor. Work also continued on assorted small fills and grading of subgrade in <br />the general azea. <br />No confirmation drilling was performed in this area during this reporting period. <br />Phase IVc <br />Ames did not perform any cut or fill activities within the Phase IVc azeas during this reporting <br />period. <br />Confirmation drilling was performed in the Phase IVc construction area on underground working <br />UG-294B boreholes 27-36. Drilling is complete on this working as of September Sd'. Drilling <br />proceeded in the Phase IVc construction azea on UG-236 For boreholes 10-30. Drilling for this <br />underground working is complete as of September 7`s wiih all grouting and surveying finished. <br />(See Attachment A for approximate construction locations for all Phase N azeas.) <br />Field Monitorine and Testing Activities <br />Golder observed construction activities associated with Phase IV earthworks. All construction <br />materials and soil materials were verified as suitable and construction methods were in accordance <br /> <br />Phve IVJI Sept2-$epte.doe Golder Associates Inc. <br />