Laserfiche WebLink
Phase IV Weekly Summary No. 30 Page 3 003-2203 <br />Field Monitoring and Testing Activities <br />Golder monitored SF placement in all the Phase IV azeas, including, verification of lift thickness, <br />material, compactive effort, particle size, and temperature for compliance with the drawings and <br />specifications. Two nuclear moisture-density tests were performed on the Phase IVa southern access <br />road construction. Tests SFNa-O1 and SFNa-02 passed per project specification, as the material <br />placed was testable per ASTM D698. No nucleaz moisture density tests were performed on the <br />Phase IVb LOB azea during this reporting period, as material was un-testable per ASTM D698. One <br />sample of SF were collected (SFa-OS) from the Phase IVa area and transported to the Golder trailer <br />for index testing. Laboratory testing verified that materials being placed were testable per ASTM <br />D698, proctorable. Grain-size results for SFa-OS passed SF specification. <br />Golder observed the removal of oversized and deleterious material from all fill azeas. <br />Golder observed and recorded confirmation drilling and excavation remediation of underground e <br />workings in the all Phase IV azeas during this reporting period. <br />Laboratory Test Results <br />Golder conducted one proctor, grain-size, and atterberg limits on sample SFa-O5. Results indicated a <br />passing SF specification for grain-size and atterberg limits, and was deemed testable for compaction <br />testing (ASTM D-698). <br />(See Attachment B for laboratory testing results.) <br />• Meetings <br />CC&V held a Weekly Contractor meeting on August 28a'. Items discussed include Safety, <br />Environmental, Schedule, and CQA. The next weekly meeting will be held on September Su', 2001 <br />at 10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment C. <br />Sincerely, <br />Bob Nichols <br />Resident CQA Monitor <br />PM1UeIVa 30 Aug365eptl.d~c Golder Associates inc. <br />