My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE129033
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE129033
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:26:07 PM
Creation date
11/25/2007 7:01:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report Weekly Summary No. 26
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ _ _- -Golder <br />ASSOCIc'~eS <br />September 4, 2001 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Weekly Summary No. 30: August 26 through September 1, 2001 <br />Cresson Project Phase IVa, b, and c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this weekly summary of Phase IVa, b, and c <br />Construction Quality Assurance (CQA) services performed for the Cresson Project during the period of <br />August 26`~ through September 151, 2001. <br />• The weather during this reporting period was cleaz to cloudy. Approximate daytime low temperatures <br />ranged from 43° F to 49° F, with highs ranging from 65° F to 80° F. Rain was recorded on August 28`", <br />29"', and 30'". Weather observations were made on the five days worked of this seven-day reporting <br />period. <br />Construction Synopsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthwork contractor for the Phase IVa, <br />b, and c construction. Ames conducted Phase IVa, b, and c construction activities on five days of <br />this seven-day reporting period (August 27s' through August 31st). <br />Phase IVa <br />Ames continued Structural Fill placement and compaction efforts in the Upper Arequa Gulch azea <br />(between Run of Mine haul road and Bull Hill). Materials were loaded by a Caterpillaz 375 track- <br />hoe and a Caterpillaz 9921oader into 777 haul trucks from a blast clearing and bonow azea east of <br />Highway 67 and west of the Phase IVa limits. Structural Fill (SF) material was then offloaded and <br />spread by a D10 dozer into lifts not exceeding 3 feet in thickness. Structural Fill gradation varied at <br />times and the lift thickness ranged between 1.5 and 3 feet in thickness accordingly. Ames removed <br />deleterious and oversized material from the fill azea. Oversize material was removed by the <br />Caterpillar D 10 dozer and pushed to the random fill construction azea, northeast of the compacted SF <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303) 985-2080 <br />Golder Associates Inc. <br />