My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE128600
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE128600
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:25:43 PM
Creation date
11/25/2007 6:22:00 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Permit File
Doc Date
12/11/2001
Section_Exhibit Name
VOLUME 2 MINE PLANNING APPENDIX - ROOF CONTROL PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAFETY PROCEDURE FOR INSTALLING TEMPORARY SUPPORT <br /> <br />perso <br />• ns are required to enter such areas, either to travel <br />ever the fallen material, to clean it up, or to perform <br />other duties, the roof will be supported adequately. <br />a. A certifies company official will supervise the work, <br /> unless the r~orkmen are specially trained to do such <br /> work. <br />b. An ATS system will be used to support the fall area <br /> when available and applicable. Otherwise, adequate <br /> temporary support, (.lacks or timbers) on not more <br /> loan five-foot centers will oe set at the edoe of the <br /> fall where work is to be started and advanced as work <br /> progresses. <br />c. Temporary support mentioned aoove shall be replaced <br /> by permanent supports (roof bolts and/or posts) and <br /> advanced as cleanup work progresses. <br />d. Permanent bolting or timbering will proceed fro R. <br /> permanently Supported reef ±e the temporary supports <br /> before other work is performed except clean-up work <br /> necessary for the proper installation of the <br /> permanent supports. <br />e. Where necessary to lest material before support car <br /> be set, such loading will be done from areas o. <br /> permanent support with the operator and other persons <br /> in the area under supoorter roof at all times. <br />f. Where feasible, permanent supports will be placed in <br /> the fall area bet""ore loaning starts. <br />g. A written plan containing the procedures to be fol- <br /> lowed in the event of a roof fall will be devised by <br /> management and postea at tiie scene of the roof fall. <br />h. All roof falls in active areas, Lhat are not to be <br /> cleaned up shall be posted off at each entrance to <br /> the area by at leapt one (1) row of posts (or the <br /> equivalent) installer on net more than 5-fon*. centers <br /> across the opening ano "GANGER" signs placed at all <br /> entrances into the fall area. <br />• <br />Paqe Ten A <br />Revised 06/G4/80 <br />