My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE128342
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE128342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:25:28 PM
Creation date
11/25/2007 5:59:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Permit File
Doc Date
11/8/1988
Section_Exhibit Name
EXHIBIT D MINE PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />D.7 Heap Leach Facilities Description <br />D.7.1 General <br />The heap leach facilities consist of a leach pad, a <br />barren solution pond, and a pregnant solution ~~ond, as well <br /> as the necessary ditch systems for solution collection and <br />' runoff diversion. As discussed in Section D.5, the pregnant <br /> solution is conveyed by pumping from the ponds to the mill <br /> where it is combined with the final stages of the milling <br /> circuit for processing. Solutions will be pumped to and from <br />' the mill in pressure tested piping. The proposed heap leach <br />plan map, typical cross-sections, and typical details are shown <br />' on Figures C-10, C-11, and C-12, respectively. <br />The heap leach facilities are designed to operate as a <br />closed-circuit system. The ponds are sized to store required <br />operating net inflows from average climatic conditions, heap <br />' draindown, and the 100-yr, 24-hr design storm event without <br />overtopping. The pad liners have been designed as double-lined <br />r <br />' system with a secondary recovery system between the two liners <br />to intercept, control and recover potential leaks through the <br />' upper liner. The pond liners has been designed as a double <br />liner system with a leak detection layer to allow monitoring <br />of liner integrity. The facilities layout provides positive <br />drainage from the process area to the solution ponds. <br />Additional layout and design criteria pertinent to the specific <br />1 structures are discussed in the following sections. <br />All heap leach facility construction will be supervised <br />by a registered professional engineer. Certification that each <br />phase of the leach pad construction was constructed to the <br />specification approved in the permit will be submitted <br />following completion of construction. <br />' D-38 (Revised 4/20189) <br />
The URL can be used to link to this page
Your browser does not support the video tag.