My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE128342
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE128342
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:25:28 PM
Creation date
11/25/2007 5:59:43 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
Permit File
Doc Date
11/8/1988
Section_Exhibit Name
EXHIBIT D MINE PLAN
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> Associated with the heap leach facilities is a small <br /> borrow area southwest of the leach pad. The borrow area <br /> contains relatively clean sandy soils suitable for use in the <br /> secondary recovery system. <br />I <br /> D.7.2 Site Description <br /> h <br /> The <br />eap leach facility is located southwest of the mine <br /> pit area, south of the Rito Seco, and just south and <br />' immediately downgradient from the saddle area uF~on which the <br /> process area will be situated. The total area impacted by this <br /> facility is approximately 63 acres. <br />' Natural ground slopes at this site vary from near <br /> horizontal to 4H:1V. The average slope in the area is between <br />' five and 10 percent. Vegetation is characteristic of the <br />b <br />fl <br />S <br />il <br />th <br />l <br />kh <br />l <br />ll <br />d <br /> sage <br />rush <br />ats. <br />o <br />s are of <br />e B <br />ac <br />al <br />grave <br />y san <br />y <br /> loam. <br />1 <br /> During June and July 1988, a total of seven test pits <br />' were excavated in the leach pad and mill process area. Three <br /> boreholes were also drilled in this area. Logs for the test <br /> pits and boreholes, as well as an exploration location map are <br />' contained in Appendix C. Standpipe piezometers were installed <br /> in boreholes BH-6 and BH-8 as part of the field exploration <br /> program. The completion details for these piezometers are <br /> included in Appendix E. A geotechnical laboratory testing <br />' program was completed on selected samples taken from the test <br /> pits and boreholes. The results of the laboratory testing <br />' program are included in Appendix D. <br />Based on the results of the subsurface exploration <br />program and the geotechnical laboratory program, the subsurface <br />1 profile in the vicinity of the heap leach facil~ty consists <br />of relatively deep deposits of alluvial sediments, composed <br />predominantly of poorly consolidated silty and gravelly sands <br />~l <br />' D-39 <br />
The URL can be used to link to this page
Your browser does not support the video tag.