Laserfiche WebLink
<br />• DIVISION OF MINERALS & GEOLOGY BOARD PERMIT APPLICAT[ON <br />REGULAR OPERATION (112) <br />PROJECT NAhIF.: BOGUL/RIVER P]T <br />An access road to the plant will be constructed from the <br />existing access road along the west boundary of Phase II to <br />the proposed plant site. Roads from Phase I will be left <br />operational for Phase II. Roads in Phase I that are not <br />used will be phased out and reclaimed. <br />Dewatering operations in Phase I1 will be similar to Phase <br />I operations. <br />Inge 1- <br />EXHIBI'P D - M1NlNG PLAN <br />Prior to Phase II operations, the fence will be relocated <br />along the west boundaries of Phase II operations. This <br />will protect the wetland areas outside of Phase II <br />operations and prevent encroachment upon the wetland areas <br />outside of Phase II operations. The fence will also <br />prevent livestock from entering the construction area. <br />C J <br />C. Phase I1 Summary <br />1. Area: Roads <br />Dewatering <br />Mined <br />Mined <br />Mined <br />10 acres <br />0 acres <br />Plant Area (including stockpiles) <br />New Mining Area <br />Topsoil Stockpile Area <br />TOTAL AREA <br />10 acres <br />Total Wetland Area in Phase fl = 1.79 acres <br />Topsoil generated from mining, etc. (10 acres) 16,200 BCY <br />Topsoil renuiretl for reclamation - Phase I1 950 BCY <br />Excess Topsoil (commercial, etc.) 15,250 BCY <br />Estimated Gravel Reserves: 454,000 BC1' <br />Estimated Duration of Mining Operations: 5 years <br /> <br />Duckels Construction, lnc. dba Yampa Aggregates <br />41230 Routt County Rd. #129, Steamboat Springs, Colorado 80487 <br />