My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE127576
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE127576
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:24:42 PM
Creation date
11/25/2007 4:55:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/6/2005
Doc Name
Annual Operating Plan 2005 Methane Drainage Project Panels 16-24
Section_Exhibit Name
Exhibit 80 Drilling Activities - MR306
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DRILLING SCHEDULE <br />MCC will proceed with road construction and drilling activities upon approval of this <br />AOP and in accordance with the Conditions of Approval as referenced in the Forest Service <br />Decision Notice dated May 31, 2002, titled Coal Methane Drainage Project Panels 16-24 <br />Mountain Coal Company West Elk Mine. <br />Completion and approval of the Annual Bird Survey is anticipated by June 11. A <br />schedule of drilling is presented based on that date. Drilling is presumed to require 8 days per <br />hole including mobilization from site to site, setup, drilling, and rig down. Note: The <br />schedule below is based on using two drilling rigs; this schedule is subject to rig <br />availability and/or MCC operating constraints. If one rig were utilized the project <br />completion date would remain approximately the same. <br />2005 DRILL SCHEDULE <br /> Two Rigs <br /> LM 140 <br />Drill Hole Start Finish Drill Hole <br />23-08 5/09/05 5/17/05 <br />20-01 a 6113/2005 6/20/05 <br />19-01 6/21/2005 6/24/2005 <br />19-02 6/29/2005 7/3/2005 <br />19-03 7/07/2005 7112/2005 <br />19-04 7/15/2005 7/21/2005 <br />19-05 7/23/2005 7/30/2005 <br />24-08 8/02/2005 8/08/2005 <br />24-07 8/09/05 8/17/05 <br />19-07 8118/2005 812612005 <br />19-08 8/27/05 9104/05 <br />DH90 <br />Start Finish <br />2/23/2005 <br />Delays due to mechanical breakdowns, inclement weather, hole conditions, <br />operational requirements, and permit approval are not represented in the schedule. MCC <br />intends to utilize two drill rigs to complete this aggressive schedule. <br />WATER SUPPLY SYSTEM <br />MCC will install and maintain a water supply system to provide water to the drill <br />sites and for dust suppression. This system will minimize, to a large degree, the need for <br />water skidders and water trucks to travel the temporary roads. The water supply system <br />will include, but is not limited to, flexible hosing, rigid piping, water pumps, and storage <br />tanks. <br />MCC will install the water supply system prior to, or as soon as possible after the <br />construction of the drill pads. The hosing and /or pipes will be placed along side of <br />10 <br />