Laserfiche WebLink
i ~ • <br />RECLAMATION COST SUMMARY cont'd sheet 3 of 4 <br />H. EARTHNORK - STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cost (S) <br />________I______,.___________________________________________I____________ <br />I n/a I <br />~ ~ <br />~ ~ <br />------------------------------------------------------------------------ <br />Subtotal (H): <br />I. EARTNNORK - DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.l Task Description ~ Cost (S) <br />________I______________________________________________________________ <br />~ n/a ~ <br />Subtotal (I ): <br />J. EARTHNORK - TOPSOIL/SUBSOIL REPLACEMENT <br />Task No.l Task Description <br />________I____________________________________ <br />b ~ Spread Topsoil on 3.1 Acres <br />Cost (E) <br />I___________ <br />51,665 <br />Subtotal (J): 51,665 <br />