My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE127320
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE127320
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:24:26 PM
Creation date
11/25/2007 4:33:48 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977285
IBM Index Class Name
Permit File
Doc Date
7/30/1997
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I ~' <br />RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.l Task Destripti on ~ Cost (E) <br />________I______________________________________________________________ <br />2 ~ Backfill and Grade Portal Areas ~ E1, 197 <br />3 ~ Grade Closed Shaft Areas ~ 576 <br />5 ~ Portal closure ~ 5718 <br />7 ~ Portal bulkhead placement ~ 511,000 <br />________________________________________________________________________ <br />Subtotal (K): 512,991 <br />____________ <br />L. DRILL HOLE/MONITORING NELL SEALING <br />Task No.~ Task Description I Cost (E) <br />________I__________________________________________________I____________ <br />n/a <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.~ Task Description I Cost (E) <br />___________________________________________ <br />11 ~ Broadcast seed 3.2 ac _______________I_ <br />~ ___________ <br />52,444 <br />8 I Demolition - Structure removal ~ 513,266 <br />10 Seeding drill seed 19.4 ac ~ 55,075 <br />Fencing <br />12 ~ Mob/Demob from Cortez ~ 54,235 <br /> Subtotal (M ): 525,020 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): 863,420 <br />If. INDIRECT COSTS <br />____________________________________________ <br />_________________ <br />___________ <br />____________________________________________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT _________________ ___________ <br />Item No.~ Item Description <br />______ <br />______ <br />_________ ~ <br />___________ <br />_ Lost (5) <br />___________ <br />________ <br />__________ <br />____ <br />1. ~ Public liability Insurance.... ___ <br />_I <br />1.550% of dir. ~ 5983 <br />2. I Contractor's Performance Bond 0.975% of dir. 5618 <br />3. ~ Contractor's Profit........... 10.00% of dir. ~ 56,342 <br />4. ~ Job Superintendent.. <br />Subtotal (A): 57,943 <br />TOTAL CONSTRUCTION CONTRACT AMWNT (direct plus 0 & P): 871,363 <br />B. DMG PROJECT ADMINISTRATION E%PENSES <br />Item No.~ Item Description ~ Cost (E) <br />1. I Minerals Program Adm 5.00% of cnt r.~ 53,568 <br />NET INDIRECT COST PERCENTAGE: 18.15X Subtotal (B): 53,568 <br />TOTAL INDIRECT RECLAMATION COSTS (subtotals A through B): 511,512 <br />TOTAL PERFORMANCE BOND AMOUNT (direct plus indirect costs): 574,932 <br />
The URL can be used to link to this page
Your browser does not support the video tag.