Laserfiche WebLink
<br />RECLAMATION LOST SUMMARY cont'd sheet 2 of 4 <br />D. EARTHWORK - FILL COMPACTION <br />Task No.l Task Description Cost (E) <br />________I____________________________________________________.,_________ <br />n/a <br />Subtotal (D ): <br />E- EARTHWORK - RIPPING <br />Task No.~ Task Description Cost (E) <br />__________________________________________________________I____________ <br />9 ~ Rip All Areas to be Drill Seeded ~ E4,020 <br />________________________________________________________________________ <br />Subtotal (E ): E4,020 <br />F. EARTHWORK - ROAD RECLAMATION <br />Task No.~ iask Description ~ Cost (E) <br />________I______________________________________________________________ <br />I see task 9 I <br />Subtotal (F) <br />G. EARTHWORK - FINISH GRADING <br />Task No.~ Task Description ~ Cos[ (E) <br />________I______~_____________________________________~_____I____________ <br />see task 1 <br />Subtotal (G): <br />