Laserfiche WebLink
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION _. _ .. _ - _ .:_ _. - <br />Date : 18-Jul-2006 Permit or job no.: M-2006-032 Site : Bellgardt Pit <br />User : GRM Abbreviation : none State :Colorado <br />Filename : M032-000 <br />Agency or organization name :Division Of Mining, Reclamtion And Safety <br />Permit or job action :Initial Reclamation Liabilty Estimate - 2006 <br />County :Montrose <br />TASK LIST /DIRECT COSTSI <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />Ola -grade out ponds and ditches dozer 1 5.3 $890 <br />02a -place overburden on 7 acres of flat aea scraper2 1 64.4 $>2,804 <br />03a -move topsoil to slopes and flat area truckl 1 12.0 $4,172 <br />04a -rough grade 7 acres dozer 1 29.4 $4,920 <br />OSa -reveg of 1 acre of slope revege 1 16.0 $4,289 <br />06a -reveg of 13.5 acres to hay field revege 1 24.0 $9,925 <br />07a -initial mobilization to site mobilize 6 3.1 $1, 789 <br />OSa -secondary seeding mobilization mobilize 1 3.0 $343 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />suarorALS: 157.3 $39,132 <br />' inclutles inflation factor adjustment of : NA % TOTAL DIRECT COST' - $39,132 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT- L/ablllty inSUranCe : 2.02 % Of difect total = $790 <br />Performance bond : 1.05 %ofdirect total = $411 <br />Job superintendent : 78.69 hrs'...$/hr $39.38 total = $3,099 <br />Profit : 10.00 %ofdirect total = $3,913 <br />'assume net hours = 50% o/task hours TOTAL O $ P = $8, 214 <br />LEGAL-ENGINEERING-PROJECT MANAGEMENT- CONTRACT AMOUNT (direct+OSP)= $47,346 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $2,367 <br />CONTINGENCY- NA' NA total= NA <br />'contingencies accounted for at task level TOTAL INDIRECT COST= $11,081 <br />TOTAL BOND AMOUNT (direct + indirect) _ $50,213 <br />