Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task # : 01a <br />Date : 07/18/2006 <br />User: GRM <br />CIRCES Cost Estimating Software <br />BULLD02ER WORK <br />State :Colorado <br />County :Montrose <br />Site : Bellgardt Pit <br />Agency or organization name : DMG <br />Permit or other job action :Initial Reclamation Liabilty Estimate-2006 <br />Task description :grade out 1.95 acres of ponds /ditches <br />HOURLY EQUIPMENT COST <br /> Basic machine :Cat D8R Series II - SU (2005) Horsepower : 310 <br /> Blade type :Universal <br /> Attachment no. 1 :ROPS Cab Shift basis : i perday <br /> Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cosUhour : $58.50 NA <br /> OperatingcosUhour : $74.00 100 <br /> Ripper op.cosUhour : $1.71 25 <br /> Operator cosUhour: $32.78 NA <br /> <br />~~ .. Total unit cosUhour : <br />w .-.._ <br />- <br />._ $167.00 Total <br />__ fleet cosVhour : $167.00 <br />__ <br />~ _ <br />, <br />M _ <br />m.- <br />MATERIAL QUANTITIES y <br />Initial Swell Loose <br />volume: 3,500 LCY factor: NA volume: 3,500 LCY <br />Source of estimated volume :Reclamation Plan Estimate <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,627.0 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (1shiH/day) <br />Compacted ill or embankment Spoil pile : 0.80 (fnd-riJ <br /> Push gradient : 1.00 (Cat HB) <br />Average push gradient : 0.00 % (neg) Altitude : 1.00 (Cat HB) <br />Average site altitude : 6,920 feet Material weight : 0.90 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,550 Ibs/LCY Net correction : 0.40 <br />Weight description <br />Earth -Dry packed Adjusted unit production : 656.79 LCY/hr <br /> Adjusted fleet production : 656.79 LCY/hr <br /> <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) Total job time : 5.33 Hours <br />Unit cost : $0.254 /LCY Total job cost : $890 <br /> <br />PermiUjob# : M-2006-032 <br />Abbreviation :none <br />Filename :M032-01a <br />