Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name :OMG <br />sheet 1 of 2 <br />Task # : 08a State :Colorado <br />Date : 07/18/2006 County :Montrose <br />User : GRM Site : Bel/gardt Pit <br />PermiUjob # : M-2006-032 <br />Abbreviation :none <br />Filename : M032-08a <br />Permit or other job action :Initial Reclamation Liabilty Estimate - 2006 <br />task description :Secondary seeding mobilization <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 perday <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description : Generic folding gooseneck, drop deck equipment trailer (257, 507, and 1007) <br /> Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown: OwnershipcosUhour; $16.63 $18.37 $22.33 <br /> OperatingcosUhour: $44.38 $46.13 $50.07 <br /> OperatorcosUhour: $27.66 $27.66 $27.66 <br /> Helper wsUhour : $0.00 $25.39 $25.39 <br /> Total Unit CosUhour: $88.67 $117.55 $125.45 <br />NON•ROADABLE ~UIPMENT <br />Machine <br />Description Weightlunit <br />(Tons) Ownership <br />CosUhr/unit Haul Rig <br />CosUhr/unit Fleet Size <br />(No. units) Haut Trip <br />CosUhr/fleet Retum Trip <br />CosUhr/Fleet DOT permit <br />Cost/fleet <br />-reveg tractor 10.00 $20.00 $88.67 1 $108.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $108.67 $88.67 $0.00 <br />