Laserfiche WebLink
_. - - _ - <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />CosUhour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/flees Return Trip <br />Costlhr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $53.79 1 $53.79 $53.79 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: $53.79 $53.79 <br />EQUIPMENT HAUL DISTANCE and TIME <br />Nearest major city or town within project area region <br />Transportation Cvcle Time : Non- Total one-way travel distance <br />Roadable Roadable Average travel speed <br />Haul time (hours) _ <br />Return time (hours) _ <br />Loading time (hours) _ <br />Unloading time (hours) _ <br />Subtotals = <br />JOB TIME AND COST <br />0.25 0.25 Total non-roadable mob/demob cost' <br />0.25 0.25 `two round tops with haul rig <br />0.50 NA Total roadable mob/demob cost "' <br />0.50 NA "one round trip, no haul rig <br />1.50 0.50 <br />Montrose <br />10.0 miles <br />40.0 mph <br />$316.01 <br />$26.90. <br />Total job tlme : 3.00 hours <br />Total job cost : $343 <br />