Laserfiche WebLink
__: _ ~ _ _ . <br />ROADABLE EQUIPMENT sheet 2 of 2 <br />Machine <br />Description Total <br />CosUhour/unit Fleet Size <br />(No. units) Haul Trip <br />CosUhr/fleet Return Trip <br />CosUhr/fleet <br />-Flatbed Truck, 4x2, 30K GVW $53.79 1 $53.79 $53.79 <br />-Water Tanker, 7,000Gal. $116.26 f $116.26 $116.26 <br />ERR $0.00 1 $0.00 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $170.05 $170.05 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Montrose <br />Transportation Cvcle Time : Non- Total one-way travel distance : 10.0 miles <br /> Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 0.29 0.29 Total non-roadable mob/demob cost ` : $1,692.27 <br />Return time (hours) = 0.29 0.29 ' Mro round trips with haul rig <br />Loading time (hours) = 0.50 NA_ Total roadable mob/demob cost " : $97.17 <br />Unloading time (hours) = 0.50 NA "one round lnp, no haul rig <br />Subtotals = 1.57 0.57 <br /> ;: ,_ <br />JOB TIME AND COST Total job time : 3.14 hours <br /> Total job cost : $1,789 <br />