Laserfiche WebLink
CIRCES Cost Estimating Software <br />EQUIPMENT MOBILIZATION /DEMOBILIZATION <br />__- _ - b_ <br />PROJECT IDENTIFICATION sheet 1 of 2 <br />Agency or organization name : DMG <br />Task # : Oda State :Colorado PermiUjob # : M-2006-032 <br />Date : 07/18/2006 County :Montrose Abbreviation :none <br />User : GRM Site :Bel/gard[ Pit Filename :M032-O6a <br />Permit or other job action :Initial Reclamation Liabi/ty Estimate - 2006 <br />Task description :Initial Mobilization to /from Site <br />EQUIPMENT TRANSPORT RIG COST Shift basis : i per day <br />Cost data source : CRG Data <br />Truck tractor description :Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T. 50T, and 100T1 <br />Available rig capacities : 0-25 Tons <br />Cost Breakdown : Ownership cosUhour : $16.63 <br />OperatingcosUhour: $44.38 <br />Operator cosUhour : $27.66 <br />Helper cosUhour : $0.00 <br />Total Unit CosUhour : $88.67 <br />NON-ROADABLE EQUIPMENT <br />Machine WeighUunit Ownership Haul Rig Fleet Size <br />Description (Tons) CosUhr/unit CosUhr/unit (No. units) 26-50 Tons 51+ Tons <br />$18.37 $22.33 <br />$46.13 $50.07 <br />$27.66 $27.66 <br />$25.39 $25.39 <br />$11755 $125.45 <br /> <br />Haul Trip Return Trip DOT permit <br />Cost/hdfleet CosUhr/fleet CosUfleet <br />-reveg tractor 10.00 $20.00 $88.67 1 $108.67 $88.67 $0.00 <br />-Cat D8R Series !! - 8U (200 53.17 $51.44 $125.45 1 $176.89 $125.45 $0.00 <br />-Cat 627G 40.90 $56.90 $117.55 1 $174.45 $117.55 $0.00 <br />-CAT928G 12.91 $16.03 $88.67 1 $104.70 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals: $564.70 $420.34 $0.00 <br />