My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE126208
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE126208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:28 PM
Creation date
11/25/2007 3:05:49 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980007
IBM Index Class Name
Permit File
Doc Date
6/24/2004
Section_Exhibit Name
Exhibit 07 NPDES Permit
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PARTI <br />Page No. 10 <br />Permit No.: CO-0038776 <br />C. DEFINITIONS OF TERMS (continued) <br />I5. "Total Metals" means the concentration of metals determined on an unfiltered sample following vigorous digestion (Section 4.1.3), <br />or the sum of the concentrations of metals in both the dissolved and suspended fractions, as described in "Manual of Methods for <br />Chemical Analysis of Water and Wastes," U.S. Environmental Protection Agency, Mazch 1979, or its equivalent. <br />16. "Total Recoverable Metals" means that ponion of a water and suspended sediment sampple measured by the total recoverable <br />analytical procedure described in "Methods for Chemical Analysis of Water and Wastes, " U.S. Environmental Protection Agency, <br />March 1979 or its equivalent. <br />17. "Twenty four (24 hour composite" sample is a combination of at least eight (8) sample aliquots of at least 100 milliliters, collected <br />at equally spaced intervals during the operating hours of a facility over atwenty-four (24) hour period.. For volatile pollutants, <br />aliquots must be combined in the laboratory immediately before analysis. The composite must be flow proportional; either the time <br />interval between each aliquot or the volume of each aliquot must be proportional to either the wastewater or effluent flow at the time <br />of sampling or the total wastewater or effluent flow since the collection of the previous aliquot. Aliquots may be collected manually <br />or automatically. <br />18. "Twice Monthly" monitoring frequency means that two samples shall be collected each calendar month on sepazate weeks with at <br />least one full week between the two sample dates. Also, there shall be at least one full week between the second sample of a month <br />and the first sample of the following month. <br />19. "Visual" observation is observing the dischazge to check for the presence of a visible sheen or floating oil. <br />20. "Water Quality Control Division" or "Division" means the state Water Quality Control Division as established in 25-8-101 et al.) <br />Additional relevant definitions are found in the Colorado Water ualiry Control Act, CRS §§ 25-8-101 et seg•, the Colorado <br />Discharge Permit System Regulations,Regulation 61 (5 CCR 1002-61~ and other applicable regulations.-. <br />D. SPECIAL. REQUIREMENTS <br />1. Materials Containment Plan <br />Pursuant to Sections 61.8(3)(1:) and (r) of the Colorado Discharge Permit System Regulations, the permittee is required to submit a <br />Materials Containment Plan. ~-SSuch a plan was previously submitted to the Division. An update of the plan shall be subrmtted to the <br />Division within ninety (90) days after the effective date of this pemait and riust be impplemented. The update of the plan shall include <br />changes in the information and procedures for the prevention and containment of spills of materials used, processed or stored at the <br />faciht~ which if spilled would have a reasonable probability of having a visible or otherwise detrimental impact on waters of the <br />State -/-. The updated plan shall include, but not necessarily be limited to: <br />a. An updated history of the spills which have occuned in the three (3) years preceding the effective date of this pemtit. The <br />history shall include a discussion on the cause of the spills and a tfie preventative measures designed to eliminate them from <br />reoccurring; <br />b. An update of the reporting system which will be used to notify, at a minimum, responsible facility management, the Division, the <br />Environmental Protection Agency, downstream water users within 5 miles downstream of the facrlity, and local health officials; <br />c. A description of any changes in the preventative facilities (including overall facility plot) which prevent, contain, or treat spills <br />and unplanned discharges; <br />d. A ctuxent list which includes the volttmes or quantities of all materials used, processed, or stored at the facility which represent a <br />potential spill threat to surface waters. The location of stored material shall be indicated on the facility plot submitted for item c; <br />e. An implementation schedule for additional facilities which might be required in item c, but which are not yet operational; <br />f. A cunent list of available outside contractors, agencies, or other sources which could be utilized in the event of a spill in order to <br />cleanup its effects. If the facility is capable of handling spills in-house, this shall be documented in the plan; <br />g. Provision for yeazly review and updating of the contingency plan, plus resubmission of the plan to the Division if conditions <br />and/or procedtues at the facility change the original plan. <br />The foregoing provisions shall in no way render inapplicable those re ltirements imposed by the Federal Water Pollution Control <br />Act, 33 U.S.C. § ]321, regulations promulgated thereunder, the Colorado Water Quality Control Act, and regguulations promulgated <br />theretmder. It is recommended that this plan be prepared by a professional engineer registered m the State of Colorado. <br />Nothing herein contained shall be construed as allowing any dischazge to waters of the State other than through the discharge points <br />specifically authorized in this permit. Nothing herein contained shall be constmed as excusing any liability the permittee might have, <br />ctvtl or rnm,nal, for any spill. <br />The submittal of a Spill Prevention Control and Countermeaslue Plan (SPCC Plan) as required by 40 CFR Part 112 ma satisfy all or <br />part of this requirement. Should additional materials exist on site which aze not addressed m the SPCC Plan, addressing those <br />materials as per the above is required. <br />1/ If there is no such material present at the site, this shall be indicated in writing and submitted to the Division for review. <br />2/ If there is material presrn[ but the permittce feels [here is not a reasonable probability of a spill impacting waters oC the State, this shall be documented in <br />writing and submitted to the Division for review. This documrntation shall include; I) distance [o nearest surface waters, and; 2) a detailed description of any <br />strucNre which pmh,bits the release of material onto the Bound or into a conveyance system <br />Revised 4/19/2004 <br />
The URL can be used to link to this page
Your browser does not support the video tag.