Laserfiche WebLink
CATERPILLAR INC. <br />PLBHT PRODUCTION AND COST ANALYSIS <br />It <br />L J <br />TOPSOIL RHDISTRIHUTION.COSTS POR HO LOADOUT: FACILITIHS S RAILROAD <br />HAYDEN OVLCH TOPSOIL HO THRM INC 16-JAN-96 Pags - 4- <br />Cost Summarp --- HO TOPSO - RAILROAD <br />HAYDBN OOLCH TOPSOIL <br />5,165 TONS <br /> Cost par Hour Operating S per <br />Bquipmaat Qty Nodal (each unit) Hours $ Total TON <br />Loaders 0 0 0.000 <br />Haulers 2.6376 225.62 34 7,581 1.468 <br /> 0 0 0.000 <br />Total 2 34 7,581 1.468 <br />Support 1 1 1•D10N 196.29 13 2,473 0.479 <br />2 1.140 99.56 13 1,254 0.243 <br />3 1•LU8 TRR SB.55 13 738 0.143 <br />4 1•WTR TRR ,82.21 13 1,036 0.201 <br />5 1•FUL TRH'. 46.72 13 589 0.114 <br />6 0 0 0.000 <br />Total 5 65 6,090 1.179 <br />Pleat Total- 0 99 13,671 2.647 <br />Productivity end Cost --- HO TOPSO-RAILROAD PPC-ic2 <br />Qty i Nodsl 2.6376 <br />BCY /Load ( 2,021 Lbs/HCY). 29.64 <br />Hauler - Payload, TONS....... 30.00 <br />- 4 of Payload Index.. 80.0 <br />Load Tice, Niauta^ .......... 1.00 <br />°auler Cycle T <br />Load ........................ <br />Haul ......................... <br />Dump and Nsnsuver............ <br />Return ....................... <br />Potential Cycle Time.. <br />Wait oa Slow Hauler.......... <br />Wait to Load.~[Hunchinq-NIN ]. <br />Total Cycle Time...... <br />1.00 <br />5.06 <br />0.60 <br />2.89 <br />9.55 <br />0.00 <br />9.55 <br /> <br />23-3-36 <br />Potential Production <br />TONS /Sour Avq MPH <br />6376 377 17.1 <br />peratiag Schadul <br />Operstor Hffieiaacp 80! <br />Schad Hra/Year 2,112 <br />Pleat Availability 80.03 <br />TONS /SChwd Sr 241 <br />Total TONS 5,165 <br />Schad Hrs Regd 21 <br />Total S 13,943 <br />$ per TON 2.700 <br />TONS /Year 509,322 <br />Years Required 0.01 <br />REVISED O1/30/96 <br />