Laserfiche WebLink
CATERPILLAR INC. <br />FLSET PRODOCTION AND COST ANALYSIS <br />i <br />TOPSOIL REDISTRIHOTION COSTS FOR H6 LOADOUT: PACILITI88 A RAILROAD <br />HAYDEN 6VLC8 TOPSOIL H6 TffitM LNC 16-SAN-96 Page - 3- <br />Overall Productioa and Cost Summarp <br />HAYDffiI GULCH TOPSOIL <br />FPC-2a1 <br /> <br />I~ <br />Fleet <br />Name Course <br />Name Material <br />Qty TONS TONS per <br />8ched Hr Schad Hrs <br />Required <br />S Total $ <br />par TON <br />H6 TOPSO RAILROAD 5,165 241 21 13,963 2.700 <br />H6 TOPSO LOOPBFAC 61,677 556 111 72,213 1.171 <br />Cost Summary --- HO TOPSO - TOTAL <br />HAYDEN GULCH TOPSOIL <br />66,862 TONS <br /> Cost per Hour Operating S par <br />Equipmeat Qty Model (each unit) Hours $ Total TON <br />Loaders p 0 0.000 <br />Haulers 2.637E 224.62 211 67,631 0.713 <br /> 0 0 0.000 <br />Total T 211 67,651 0.713 <br />Support d 1 1•D10N - 196.29. 79 .15,546 0.233 <br />2 1.146 99.56 79 7,885 0.118 <br />3 1•LUB TR1C 58.55 79 4,637 0.069 <br />4 1•VJTR TER 82.21 79 6,511 0.097 <br />5 1•FUL THE 46.72 79 3,700 O.OSS <br />6 0 0 0.000 <br />Total 5 395 38,279 0.573 <br />Fleet Total 0 606 85,930 1.286 <br />23-3-35 <br />REVISED 01/30/96 <br />