Laserfiche WebLink
CATERPILLAR INC. <br />FLEET PRODUCTION AND COST ANALYSIS <br />• <br />TOPSOIL REDISTRIBUTION COSTS FOR HO LOADOUT: PACILITIES & RAILROAD <br />HAYDSN 0ULC8 TOPSOIL HO TERM INC 16-JAN-96 Page - 2- <br />Overall Production aad Cost Sumsarp <br />HAYDSN GULCH TOPSOIL <br />FPC-2a1 <br />• <br />Fleet <br />Mama Course <br />Name Material <br />Qty TOMB TONS per <br />ached Hr Schad ers <br />Required <br />S Total $ <br />per TON <br />HO TOPSO TOTALS .. 66,842 506 132 86,156 1.259 <br />Overall Production and Cost Summary <br />HAYDEN GULCH TOPSOIL <br />FPC-2a1 <br />Fleet <br />Name Course <br />Name Material <br />Qty TONB TONS par <br />Schad er Schad Rra <br />Required <br />S Total $ <br />par TON <br />80 TOPSO RAILROAD <br />LOOPBPAC 5,165 <br />61,677 241 <br />556 Z1 <br />111 13,943 <br />72,213 2.700 <br />1.171 <br />80 TOPSO TOTALS .. 66,842 506 132 86,156 1.289 <br />GRAND TOTAL.. 66,842 506 132 86,156 1.289 <br />overall Production aad Cost Sumary <br />BAYDBN GULCH TOPBOIL <br />PPC-2a1 <br />Fleet <br />Name Course <br />Name Material <br />Qty TOMS TONS per <br />Schsd Hr Schad Srs <br />Required <br />$ Total S <br />per TON <br />HO TOPSO RAILROAD 5,165 241 21 13,943 2.700 <br />HO TOPSO LOOPBFAC 61,677 556 111 72,213 1.171 <br />23-3-34 <br />REVISED 01/30/96 <br />