Laserfiche WebLink
CATERPILLAR INC. <br />FLEET PRODIICTION AND COST ANALYSIS <br />• <br />TOPSOIL REDISTRIBUTION COSTS FOR 80 LOADOUT: FACILITIES S RAILROAD <br />HAYDSN OVLCH TOPSOIL HO TERN INC 16-JAN-96 Page - 1- <br />Cost Sumwrp --. Grand Total <br />HAYDBN GULCH TOPSOIL <br />66,842 TONS <br /> <br /> Cost per Hour Operating $ par <br />Bquipmaot Qtp Nodsl (each unit) Hours $ Total TON <br />Loader Total: 0 ~ 0 0 0.000 <br />Haulers 2 6378 225.62 212 47,651 0.713 <br />Heuler Total: 2 212 47,651 0.713 <br />Support 1 D10N 196.29 80 15,546 0.233 <br />1 14(i 99.56 80 7,885 0.118 <br />1 LVB TRR 58.55 80 4,637 0.069 <br />1 WTR TRR 82.21 80 6,511 0.097 <br />1 POL TRR 46.72 80 3,700 0.055 <br />Support Total: 5 ~ 400 38,279 0.573 <br />Grand Total: 7 612 85,930 1.286 <br />Overall Production aad Cost Suararp <br />HAYDBN lilH.CB TOPSOIL <br />FPC-2a1 <br />Fleet <br />Nue Course <br />Nsse ~ Material <br />Qtp TOMS TONS per <br />Sehed Hr Schsd Hrs <br />Required <br />$ Totel $ <br />per TON <br />HO TOP8O TOTALS .. bb,842 506 132 86,156 1.289 <br />GRAND TOTAL.. 66,842 506 132 86,156 1.289 <br />23-3-33 <br />REVISED 01/30/96 <br />