Laserfiche WebLink
CATBRPILLAR INC. <br />PLEBT PRODUCTION AND COST ANALYSIS <br />TOPSOIL REDISTRIBUTION COSTS POR 80 LOADOUTt PACILITIHS 8 RAILROAD <br />HAYDEN OULCH TOPSOIL HO THRN INC 16-JAN-96 Page - 5- <br />i• <br />HAUL - Travel Time $ Speeds <br />HAYDEN OULC8 TOPBOZL <br />Course Course Material Density Lbs per Initial <br />Name Dssc ~ Qtp TONS LCY BCY Speed <br /> H <br />RAILROAD 30'W E 9200' 5,165 2,021 2,021 2.00 <br />Empty Wt „ TOMB 56.04 Payload, TONS 30.00 Code C134 <br />HAULSR 6378 <br />ID <br />Tires 37.25-35 <br />Type 83 <br />Speed Corr. 1.00 <br />Alt. Corr.. 1.00 <br />BAUL Distance Rolling Orada NPH Potential Segment Speed Cumulative <br />SBgneat FEET Resiat$ $ Limit Speed Max at Snd Minutes <br />7,200 5.00 2.00 30.00 16.53 16.58 2.00 5.06 <br />RETURN - Travel Timm 6 Spmads <br />SAYDEN OVLCH TOPSOIL <br />• <br /> <br />Course <br />Neu Course <br />Dasc Natmrial <br />Qty TONS Deasitp Lbs per <br />LCY BCY Initial <br />Speed <br />RAILROAD 30'W E 9200' 5,165 2,021 2,021 2.00' <br />Empty Wt., TONS 56.04 Payload, TONS 30.00 Code 0134 <br />BAULER 6378 <br />ID <br />Tires 37.25-35 <br />Type H3 <br />Speed Corr. 1.00 <br />Alt. Corr.. 1.00 <br />RETURN Diataacs Rolliag Orade NPH Potential Segment Speed Cumulative) <br />Segment FEET Resiat$ 5 Limit Speed Maz pt End Niautes <br />7,200 5.00 -2.00 30.00 33.79 30.00 2.00 2.89 <br />23-3-37 <br />REVISED 01/30/96 <br />