Laserfiche WebLink
TABLE 23-1-T <br />COLORADO DIVISION OF MINERALS AND GEOLOGY <br />TER TRUCK COST DATA WORKSHEET Sheet 1 of 2 sheets <br />REVISION DATE: August. 1994 <br />WORKSHEET FILENAME: 5.OKWATK.WK1 <br />MACHINE DESCRIPTION: WATER TANKER OFF HWY. S.OK GAL. CAPY. 175NP. DIESEL <br />REFERENCES: i) COST REFERENCE GUIDE <br />2) CONSRACTORS EQUIPMENT COST GUIDE <br />3) COLORADO CONTRACTORS ASSOCIATION <br />WAGE RATE SCHEDULE <br />ST ADJUSTMENT FACTORS BASE VALUE ADJUSTED VALUE <br />Acquisition Cost: 3194.931.00 (155,363.13 <br />Economic Life Hours: 11500 9800 <br />Annual Use Hours: 2112 1300 <br />ech. Labor Cost-Zone A: 527.15 522.73 <br />-Zone B: 327.15 323.36 <br />Fuel Cost per gal.: 30.94 50.94 <br />Wbe Cost: 31.82 31.82 <br />Tire Life Hours: 3000 920 <br />Tire Purchase Price: 514.730.00 312.280.65 <br />~ ~••• BASE OWNERSHIP d OVERHAUL COSTS -•••~ -=-- •••- -••----- BASE OPERATING COSTS -•• •••• ••- <br />IC MODEL d ATTACHMENTS ~ DESCRIPTIDN ~ DEPRECIATION OHD/CFC LABOR PARTS LABOR PARTS FUEL LURE TIRES G.E .C. <br />achine Hodel No. S.OK G.,175HP 311.28 35.85 51.76 32.40 33. 86 53.78 55. 93 31.82 54. 91 30. 00 <br />Attachment 81 N/q 50.00 50.00 (0.00 50.00 50. 00 50.00 30. 00 30.00 30. 00 50. 00 <br />Attachment #2 N/A 30.00 ~ 30.00 50.00 50.00 30. 00 30.00 30. 00 (0.00 30. 00 30. 00 <br />Attachment $3 N/A 50.00 30.00 30.00 50.00 30. 00 30.00 50. 00 50.00 50. 00 30. 00 <br />BASE COST SUBTOTALS 511.28 55.85 (1.76 52.40 53.86 33.78 55.93 31.82 54.91 50.00 <br /> ~ ~•• ADJUSTED OWNERSHIP d OVERHAUL COSTS -~ -------•--- ADJUSTED OPERATING COSTS --- -••• ••- <br />i ADJUSTMENT FACTORS ~ FACTOR VALUE ~ DEPRECIATION OHD/CFC LABOR PARTS LABOR PARTS FUEL LURE TIRES G.E.C. <br />luisition Cost 0.7970 58.99 N/A N/A N/A N/A N/A N/A N/A N/A N/A <br />momic Life 1.1735 (10.55 N/A 32.07 32.62 54.53 34.44 N/A N/A N/A N/A <br />wal Usage 1.6246 314.61 39.50 N/A N/A N/A N/A N/A N/A N/A N/A <br />ible shifts .750depr.-.SOOohd (10.95 54.75 N/A N/A N/A N/A N/A N/A N/A N/A <br />iple Shifts .667depr.•.333ohd 59.74 33.16 N/A N/A N/A N/A N/A N/A N/A N/A <br />:hanic Cost - Zone A 0.8371 N/A N/A 51.73 N/A 33.79 N/A N/A N/A N/A N/A <br />- Zane B - 0.8604 N/A N/A 51.78 N/A 53.90 N/A N/A N/A N/A N/A <br />'1/Cube/Tire Cost Variable N/A N/A N/A N/A N/A N/A 55.93 31.82 316.01 30 .00 <br />ck Util. Zone A 100.00% N/A N/A 51.73 (2.82 53.79 54.44 55.93 51.82 516.01 30 .00 <br />• Zone B 100.00% N/A N/A 31.78 52.82 53.90 54.44 35.93 31.82 516.01 30 .00 <br />STED COST SUBTOTALS -S.SHIFT -ZONE A: t14.61 f9.5D 31.73 32.82 53.79 34.44 (5.93 31.82 316.01 50. 00 <br /> -ZONE B: 314.61 t9.50 31.78 32.82 53.90 34.44 55.93 31.82 316.01 50. 00 <br /> -D.SHIFTS-ZONE A: 510.95 54.75 31.73 52.82 33.79 34.44 35.93 31.82 516.01 50. 00 <br /> -ZONE 8: 310.95 34.75 31.78 52.82 53.90 t4.44 55.93 31.82 516.01 50. 00 <br /> •T.SHIFTS-ZONE A: 39.74 53.16 51.73 (2.82 33.79 54.44 25.93 51.82 516.01 50. 00 <br /> -ZONE B: 39.74 53.16 31.78 52.82 53.90 54.44 55.93 31.82 316.01 50. 00 <br />r 1 <br />L~ <br />23-1-14 REVISED 01/30/96 <br />