Laserfiche WebLink
CATBRPILLAR INC. <br />FLBHT PRODUCTION AND COST ANALYSIS <br />BALLAST RHMOVAL COSTS - HO LOADOUT FACILITY <br />HAYDHN OULCB BALLAST HO THIBI INC 16-JAH-96 <br />Overall Productioa aad Cost Sua~arp <br />HAYDHN GULCH wsT.r.r el. <br />Page - 2- <br />FPC-aal <br />Fleet <br />Nsse Coura• <br />Nsme Materiel <br />Qty TONS TONS per <br />Sched Hr Sched Hrs <br />Required. <br />$ Total $ <br />per TON <br />BALLAST TOTALS .. 9,350 49a 19 7,788 0.833 <br />Overall Produetioa aad Cost Suu~ary <br />HAYDSN GULCH A TA?•*~T <br />FPC-aal <br />Pleat <br />Nase Coure• <br />Nua Material <br />Qty TONS TONS per <br />Sched Hr Sched Bra <br />Required <br />$ Total $ <br />per TON <br />BALLAST AALL718T 9,350 493 19 7,788 0.833 <br />BALLAST TOTALS .. 9,350 49a 19 7,788 0.833 <br />GRAND TOTAL.. 9,350 49a ~ - 19 7,788 0.833 <br />• <br />Ovsrsll Productioa sad Coat Bua~ary <br />HAyDEN O~,Cg A1TS.aa+a <br />PPC-aal <br />Pleat <br />Name Coura• <br />Nase Material <br />Qtp TOMB TONS per <br />Sched Hr Sched Bra <br />Required <br />$ Total $ <br />per TON <br />nar.T.aa•n I~r.aaa7• 9,350 493 19 7,788 0.833 <br />• <br />23-3-42 REVISED 01/30/96 <br />