Laserfiche WebLink
CATERPILLAR INC. <br />PI.BET PRODUCTION AND COST ANALYSIS <br />__~€.~___. _ I <br />BALLAST RENOVAL COSTS - H6 LOADOUT PACZLITY <br />HAYDEN 6fJLCH BALLAST HO TERM INC 16-JAN-96 Page - 1- <br />CO:t Summarp . brand Total <br />HAYDHN GULCH gar.r.amr 9 350 TONS <br /> Cost per Hour operating $ par <br />Equipaaat Qtp Modsl (each unit) Hours $ Total TON <br />Loader Total: 0 0 0 0.000 <br />Haulers ] 6378 225.6] 30 6,859 0.736 <br />Hauler Totals 1 30 6,859 0.736 <br />Support 1 166 99.56 2 189 0.020 <br />1 LUB THE 58.55 6 334 0.036 <br />1 WTR TRH 82.31 1 156 0.017 <br />1 FDI. TRR 46.72 6 366 0.028 <br />Support Total: 4 ib 945 0.101 <br />Oraad Totals 6 66 7,806 0.835 <br />Overall Production and Cost Stsoarp <br />HAYDEN 6VLCH naT.*.aaT <br />• <br />r, <br />~J <br />PPC-Zai <br />Pleet <br />Name Course <br />Mace Material <br />Qtp TONS TONS per <br />Sched Hr Sched Hrs <br />Required <br />S Total S <br />psr TON <br />BALLAST .TOTALS .. 9,350 ~491~ 19 7,788 0.833 <br />GRAND TOTAL.. 9,350 691 19 7,788 0.833 <br />23-3-41 REVISED 01/30/96 <br />