Laserfiche WebLink
CATERPILLAR INC. <br />PLBBT PRODUCTION AND COST ANALYSIS <br />I• <br />BALLAST REMOVAL COSTS - H6 LOADOOT PACILITY <br />BAYDEM 6VLC8 BALLAST H6 TERM INC 16-JAN-96 <br />Overall Production and Cost Summary <br />HAYDEN GULCH war.T.n wT <br />Pegs - 3- <br />u <br /> <br />FPC-2a1 <br />Pleat <br />Name Course <br />Naas Materiel <br />Qtp TONS TONS per <br />Sched Hr Sched Hrs <br />Required $ <br />$ Total per TON <br />war.r.n am Igu,LAgT 9,350 493 19 7,788 0.833 <br />Cost Sumaarp --- wa*.T.aeT -TOTAL <br />HAYDEN 6VLCH BALLAST <br />9,350 TONS <br /> Cost par Hour Operating $ Per <br />8quipment Qty Model (eseh unit) Hours $ Total TON <br />Loaders 0 0 0.000 <br />Haulers 2.637E .225.62 30 6,859 0.734 <br /> 0 0 0.000 <br />Total 2 30 6,859 0.736 <br />Support / 1 1.146 99.56 2 189 0.020 <br />2 1•LUB TRIt 58.55 6 334 0.036 <br />3 1•NTR TRI 82.21 2 156 0.017 <br />6 - 1•PUL TRR ~ 46.72 6 ..~~_266 0.028 <br />5 0 0 0.000 <br />6 O O 0.000 <br />Total 4 16 965 0.101 <br />Float Total 0 46 7,806 0.835 <br />23-3-43 <br />REVISED 01/30/96 <br />