My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125933
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125933
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:14 PM
Creation date
11/25/2007 2:38:04 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1996079
IBM Index Class Name
Permit File
Doc Date
11/21/1996
Doc Name
PERMIT APPLICATION FN M-86-079 PRELIMINARY ADEQUACY REVIEW
From
DMG
To
BARNARD QUARRIES
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
n <br /> <br /> <br />tc <br />(b) Please clarify where sal aged topsoil will stored and the <br />stabilization techniques at will be used to protect this <br />valuable resource. Also how location where stockpiles will <br />be located on Exhibit E m p. <br />(e) Please identify the prop sed routes that will be used to <br />access the mine site and o transport the mined material off <br />of Beech Hill. <br />(n) If more than 3600 tons of material is to be extracted in any <br />12 month period, a Limit d Impact Special Use Permit from <br />Boulder County will be r fired. Please state whether the <br />annual extraction is expec ed to exceed 3600 tons and contact <br />the Boulder County to obt in this permit if necessary. <br />(c)(i) A statement that a mi <br />be replaced should be <br />from six to twenty- <br />salvaged for replacen <br />one foot or more of sc <br />areas, the reclamat <br />successful. If after <br />information it beco <br />available for salvac <br />minimum could be incr <br />t D <br />~imum of six inches of topsoil will <br />inserted here. It was stated that <br />Eour inches of topsoil would be <br />ent on the reclaimed surfaces. If <br />it can be replaced on all disturbed <br />on will most certainly be more <br />submittal of the additional soil <br />nes apparent that more soil is <br />e and reclamation, the six inch <br />eased to reflect that. <br />(c)(ii) It is not mentioned a <br />statement .should be a <br />the following seeding <br />March 15th and June 1 <br />15th and before the sc <br />15 ?). <br />(c)(iii) During the site visi <br />observed that are not <br />It is the Division's c <br />Big bluestem occur it <br />Lyons sandstone area, <br />and abandoned areas. <br />added to the reclamat <br />accordingly. <br />what point seeding will occur. A <br />lded that seeding will occur within <br />windows; during the spring between <br />nth or; in the fall after September <br />it freezes for the winter (November <br />some native grass species were <br />included in the proposed seed mix. <br />~servation that Little bluestem and <br />relative abundance throughout the <br />both in undisturbed and disturbed <br />Both of these species should be <br />on seed mix. Please amend the mix <br />t E <br />(3)(d) & (e) Add approximate depths and locations of replaced <br />overburden and t psoil to reclamation map. <br />Exhibit F <br />As previously stated, if over 3 00 tons of material is mined in any <br />
The URL can be used to link to this page
Your browser does not support the video tag.