My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125881
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:12 PM
Creation date
11/25/2007 2:32:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report Weekly Summary No. 39
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ - - Associ~2~tes <br />November 20~', 2001 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />1280 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Weekly Summary No. 41: November 11 through November 17, 2001 <br />Cresson Project Phase IVa, b, and c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this weekly summary of Phase Na, b, and c <br />Construction Quality Assurance (CQA) services performed for the Cresson Project during the period of <br />November 11 a' through November 17a', 2001. <br />• The weather during this reporting period was clear to cloudy. Approximate daytime low temperatures <br />ranged from 26° F to 33° F, and highs ranging from 50° F to 64° F. Snow was recorded on November <br />17`s. Weather observations were made on all seven days of this reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthwork contractor for the Phase [Va, <br />b, and c construction. Ames conducted Phase IVa, b, and c construction activities on five days of <br />this seven-day reporting period (November 12`h through November 16a'). <br />Phase IVa <br />Ames continued cut activities in the Southern Access Road and above the existing ADR building <br />and at edge of liner (EOL) station 21+00. A Caterpillar D10 dozer pushed material to a Caterpillaz <br />992 loader, which loaded multiple haul trucks. Cut material was transported to the Arequa Gulch fill <br />within Phase IVa and/or Phase IVb. <br />Ames continued Structural Fill (SF) placement and compaction activities in the northern portion of <br />the Phase IVa footprint, in the Arequa Gulch area. SF materials were placed in horizontal lifts <br />typically not exceeding 2 feet in loose thickness. A Caterpillaz CS563C roller provided compactive <br />effort, while a Caterpillaz water wagon provided moisture conditioning when needed or required. SF <br />material would also be placed in the uncontrolled azea to the northeast of the fill when needed. <br />r1 <br />U <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303)985-2080 <br />Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.