Laserfiche WebLink
Phase IV Weekly Summary No. 40 Page 3 <br />Golder observed and documented confirmation drilling and excavation activities associated with the <br />Phase IV construction. Full time monitoring was given to remediation of underground workings. <br />• Golder observed clearing and grubbing within the Phase IV azea. All available topsoil was removed <br />and deleterious material hauled to Upper Arequa Gulch. <br />Golder observed demolition of the old Highway 67 and the Carlton retaining wall. Waste materials <br />were hauled to Upper Arequa Gulch. <br />Laboratory Test Results <br />No laboratory testing associated with the Phase IV construction was conducted during this reporting <br />period. <br />Meetings <br />CC&V held a Weekly Contractor meeting on November 6`s. Items discussed include Safety, <br />Environmental, Schedule, and CQA. The next weekly meeting will be held on November 13`h, <br />2001 at 10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment B. <br />• <br />Sincerely, <br />Bob Nichols <br />Resident CQA Monitor <br /> <br />rn.:e rv,<oro„4-~am~ Golder Associates Inc. <br />