My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125881
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:12 PM
Creation date
11/25/2007 2:32:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report Weekly Summary No. 39
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- --Golder <br />~ -Associates <br />Apri123'°, 2002 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />1280 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 51: April 7 through Apri120, 2002 <br />Cresson Project Phase 1Va, b, and c Construction Quality Assurance <br />Deaz Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Na, b, and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of April 7a' <br />through Apri120~', 2002. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low temperatures <br />ranged from 19° F to 43° F, and highs ranged from 40° F to 70° F. Snow was recorded on April 16~', <br />2002. Weather observations were made on twelve days of this fourteen-day reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthwork contractor for the Phase [Va, <br />b, and c construction. Ames conducted Phase IVa, b, and c construction activities on twelve days of <br />this fourteen-day reporting period (April 8`s through April 13`s and April 15`s through Apri120'~'). <br />Phase IVa <br />Ames placed Stmctural Fill (SF) in the Phase Na area along the northern end of the old ADR road, in <br />Arequa Gulch, and at the 9640 road at station 8+00. Structural Fill materials were placed in horizontal <br />lifts typically not exceeding 2 feet in loose thickness. A Caterpillaz CS563C roller provided compactive <br />effort, while a Caterpillar water wagon provided moisture conditioning when needed. Ames conducted <br />slope recontouring throughout the Phase Na azea and began final subgrade preparation. <br />Ames resumed construction of the 84-inch CSP by placing formwork for the wingwall footing and <br />placing approximately 14 cubic yards of concrete. <br />Ames continued to construct the Phase Na Primary Underdrain (PU) starting neaz the existing LOB <br />L~ <br />Golder Associates Inc. <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303)985-2080 <br />
The URL can be used to link to this page
Your browser does not support the video tag.