My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125881
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:12 PM
Creation date
11/25/2007 2:32:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report Weekly Summary No. 39
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
with the drawings and specifications irito excavated or open underground workings. Golder <br />previously obtained samples of SSF, CP, and CR for laboratory testing. Materials supplied met <br />specifications. Ground Engineering conducted field testing and sampling of CP concrete as per <br />specifications, and will supply 28-day strength results. <br />Golder observed and documented excavation and remediation activities associated with the Phase IV <br />underground working construction. Full time monitoring was given to excavation of underground <br />workings. <br />Golder observed and documented confirmation drilling activities associated with the Phase IV <br />construction. Full time monitoring was given to confirmation drilling of underground workings <br />including logging holes, marking drill locations, surveying holes, and documenting underground <br />workings encountered. <br />Golder provided full time observation of DCF removal from the edge of the Phase I and Phase III <br />geomembrane for defects outside of the Phase Ntie-in. Defects outside of the Phase Ntie-in were <br />marked for repair. <br />Laboratorv Test Results <br />Golder obtained QA sample SFb-08 from materials being placed as Structural Fill in Phase Nb. <br />Material met project specifications. Test results aze presented in Attachment B. <br />Meetines <br />CC&V held Weekly Contractors meetings on March 26~' and April 2"d. Items discussed include <br />Safety, Environmental, Schedule, and CQA. The next weekly meeting will be held on April 9~h, <br />2002 at 10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment C. <br />Sincerely, <br />Bob Nichols <br />Resident CQA Monitor <br />PheselVa 50 h4rchlAApnl6.doc Golder Associates inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.