Laserfiche WebLink
~ Assoc~i~.tes <br />November 13s', 2001 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />1280 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Weekly Summary No. 40: November 4 through November 10, 2001 <br />Cresson Project Phase IVa, b, and c Construction Quality Assurance <br />Deaz Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this weekly summary of Phase Na, b, and c <br />Construction Quality Assurance (CQA) services performed for the Cresson Project during the period of <br />November 4a' through November l0a', 2001. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime low temperatures <br />ranged from 20° F to 34° F, and highs ranging from 44° F to 72° F. Snow was recorded on November <br />7a' and November 8a'. Weather observations were made on all seven days of this reporting period. <br />Construction Synonsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthwork contractor for the Phase Na, <br />b, and c construction. Ames conducted Phase IVa, b, and c construction activities on five days of <br />this seven-day reporting period (November Sa' through November 9a'). <br />Phase IVa <br />Ames continued cut activities in the Southern Access Road above the existing ADR building and at <br />edge of liner (EOL) station 21+00. A Caterpillar D10 dozer pushed material to a Caterpillaz 992 <br />loader, which loaded multiple haul trucks. Cut material was transported to the Arequa Gulch fill <br />within Phase IVa and/or Phase Nb. <br />Ames continued SF placement and compaction activities in the northern portion of the Phase IVa <br />footprint, in the Arequa Gulch azea. SF materials were placed in horizontal lifts typically not <br />exceeding 2 feet in loose thickness. A Caterpillar CS563C roller provided compactive effort, while a <br />Caterpillaz water wagon provided moisture conditioning when needed or required. SF material <br />would also be placed in the uncontrolled azea to the northeast of the fill when needed. <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Associates Inc. <br />