Phase IV Weekly Summary No. 39 Page 3 003-2203 <br />Ames did not perform any cut or fill activities within the Phase Nc azeas during this reporting <br />period. <br />(See Attachment A for approximate construction locations for all Phase N azeas.) <br />Field Monitoring and Testing Activities <br />Golder observed construction activities associated with Phase IV earthworks. All construction <br />materials and soil materials were verified as suitable and construction methods were in accordance <br />with project specifications. Removal of oversized and deleterious material from all fill azeas was <br />observed. <br />Golder observed and documented confirmation drilling and excavation activities associated with the <br />Phase IV construction. Full time monitoring was given to remediation of underground workings. <br />Golder observed clearing and grubbing within the Phase N azea. All available topsoil was removed <br />and deleterious material hauled to Upper Arequa Gulch. <br />Golder observed demolition of the old Highway 67 and the Cazlton retaining wall. Waste materials <br />were hauled to Upper Arequa Gulch. <br />Laboratory Test Results <br />No laboratory testing associated with the Phase IV construction was conducted during this reporting <br />period. <br />Meetines <br />CC&V held a Weekly Contractor meeting on October 30~h. Items discussed include Safety, <br />Environmental, Schedule, and CQA. The next weekly meeting will be held on October 6's, 2001 at <br />10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment B. <br />Sincerely, <br />Bob Nichols <br />Resident CQA Monitor <br />PAue IVa l9 Ou28-NOV3.doc Golder Associates Inc. <br />