My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125881
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:12 PM
Creation date
11/25/2007 2:32:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report Weekly Summary No. 39
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i - Associates <br />Mazch 26s', 2002 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />1280 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 49: March 10 through March 23, 2002 <br />Cresson Project Phase IVa, b, and c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase fVa, b, and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of March 10"' <br />through March 23ro, 2002. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime low temperatures <br />ranged from 8° F to 33° F, and highs ranged from 27° F to 63° F. Snow was recorded on March 15~'. <br />18a', and 19~', 2002. Weather observations were made on ten days of this fourteen-day reporting period. <br />Construction Synopsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthwork contractor for the Phase IVa, <br />b, and c construction. Ames conducted Phase IVa, b, and c construction activities on ten days of this <br />fourteen-day reporting period (Mazch 11 ~' through March 15`h and Mazch 18`x' through Mazch 22nd) <br />Phase IVa <br />Ames placed Structural Fill (SF) in the Phase IVa area at station 5+00 of the 9640 road. Structural Fill <br />materials were placed in horizontal lifts typically not exceeding 2 feet in loose thickness. A Caterpillar <br />CS563C roller provided compactive effort, while a Caterpillar water wagon provided moisture <br />conditioning when needed. <br />Ames resumed construction of the 84-inch CSP by placing formwork for the headwall. <br />Ames began construction of the Phase Na Primary Underdrain (PU) beginning at the southern end <br />(neaz the ADR) and working to the North. Ames excavated trench and placed geotextile, Underdrain <br />Fill (iJF), and Select Structural Fill (SSF) for approximately 300 feet of PU. <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303)985-2080 <br />Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.