Certification Report Weekly Summary No. 39
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ames resumed SF blast drilling in the Phase Na at "D10 Hill" and blasted on Mazch 15`x, 19`s, and 2151. <br />I ~ Ames began to remove Drain Cover Fill (DCF) from the edge of Phase I along the Phase UPhase Na <br />tie-in in preparation for final grading. <br />Ames performed confirmatory drilling activities associated with the Phase IVa construction area on <br />known underground workings UG-444 and UG-545. <br />Ames conducted remediation of UG-545 by placing gravel plug material and "flow fill". Ames <br />drilled eight gravel plug placement holes where the tunnel crown depth exceeded 50 feet and three <br />flowable fill placement holes along the alignment of the working between the gravel plug and Phase <br />I. Ames placed approximately 80cy of gravel material forming a plug at the eastern extents of the <br />remediation area and placed approximately 148cy of flowable fill (cement slurry) between the gravel <br />plug and Phase I. Two additional confirmatory drill holes were drill the following day to confirm <br />the void was filled. <br />Phase IVb <br />Ames continued Structural Fill (SF) placement and compaction activities in the eastern portion of the <br />Phase IVb footprint at the temporary access road near the old highway crossing and west of the new <br />LOB. Structural Fill materials were placed in horizontal lifts typically not exceeding 2 feet in loose <br />thickness. A Caterpillaz CS563C roller provided compactive effort, while a Caterpillaz water wagon <br />provided moisture conditioning when needed. Ames conducted slope recontouring activities at the <br />West end of the temporary diversion channel and in the PSSA sump azea. Ames used Structural Fill to <br />backfill "Shallow" working UG-202. <br />Ames resumed SF blast drilling in the Phase IVb azea near the existing LOB and blasted on March <br />13`s. <br />Ames did not perform confirmation drilling in the Phase IVb area during this reporting period. <br />Ames resumed placement of Concrete Plug (CP) concrete into "Deep Shafts" UG-265 and UG-548. <br />Ames placed three feet of concrete in accordance with IFC Drawing 12, Detail 1. <br />Ames continued placement of Cemented Rockfill (CR) at UG-217, UG-251, UG-202, and UG-266 by <br />tapering the working and placing 7 feet of CR in accordance with IFC Drawing 12, Detail 1. <br />Ames placed two layers of geogrid in accordance with Drawing 12, Detail 5. Ames prepared the <br />subgrade and placed two layers of Tensar UX1700 geogrid transverse to each other, sepazated and <br />covered by SSF. <br />Phase IVc <br />Ames used Structural Fill to backfill "Shallow" workings UG-234a and UG-261. Ames also used a <br />rock hammer to break-up oversized material for placement as SF at a later date. <br />rn.,e rveas w.~nio-z3 ex Golder Associates Inc. <br />