My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125881
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:12 PM
Creation date
11/25/2007 2:32:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report Weekly Summary No. 39
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Phase IV Weekly Summary No. 48 Page 4 <br />Laboratory Test Results <br />003-2203 <br />• Golder obtained QA samples SFa-10, SFb-07, DCFb-02, and FSBc-O1 of materials being placed in <br />Phase IVa, Phase IVb, and Phase IVc. All samples met project specifications and test results aze <br />presented in Attachment B. <br />Golder continued to conduct Conformance Testing of geomembrane being produced by <br />POLYFLEX. Test results on material produced to date indicate passing values. Test results not <br />presented to date aze presented in Attachment B. <br />Golder conducted calibration of Volumetric Mixing trucks 509403 and 509405 and verified that 6% <br />by dry weight of cement was added to the Fine Shaft Backfill (FSB) as required by the specifications <br />for Cemented Rockfill. Golder also verified daily and at 300-ton intervals that the 6% cement by dry <br />weight was added. , <br />Meetinss <br />CC&V held a Weekly Contractors meeting on February 26"' and March 5~'. Items discussed include <br />Safety, Environmental, Schedule, and CQA. The next weekly meeting will be held on Mazch 12`h, <br />2002 at 10:00 AM. <br />Golder Personnel On-Site <br />• A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment C. <br />Sincerely, <br />Bob Nichols <br />Resident CQA Monitor <br />ew~rv.an e~bza-m~.~~.ao~ Golder Associates lne. <br />
The URL can be used to link to this page
Your browser does not support the video tag.