Phase IV Weekly Summary No. 48 Page 2 003-2203 <br />Ames did not perform any underground remediation activities associated with the Phase Na <br />construction during this reporting period. <br />PhaseIVb <br />Ames removed deleterious material (wood, frozen SF, oversized) and hauled this material to a <br />designated location in Upper Arequa Gulch or to the uncontrolled fill zone East of Phase Na/b. <br />Ames continued Structural Fill (SF) placement and compaction activities in the eastern portion of the <br />Phase Nb footprint at the temporary access road neaz the old highway crossing. Structural Fill <br />materials were placed in horizontal lifts typically not exceeding 2 feet in loose thickness. A Caterpillaz <br />CS563C roller provided compactive effort, while a Caterpillar water wagon provided moisture <br />conditioning when needed or required. <br />Ames resumed SF blast drilling in the Phase Nb azea neaz the existing LOB. <br />Ames performed excavation remediation activities of known underground working UG-494. This <br />working was observed and verified to be a "Deep Shaft" as defined in the drawings and will be <br />remediated accordingly. <br />Ames performed confirmatory drilling activities associated with the Phase Nb construction azea on <br />known underground workings UNK-12, EI Line 6, and UG-201. <br />Ames continued blast drilling of underground working within Phase IVb at UNK-12. Ames blasted <br />underground workings delineated by confirmation drilling at UNK-12 on February 28a' at 11:00. <br />Ames began placement of Cemented Rockfill (CR) at UG-217 by tapering the working and placing 7 <br />feet of CR in accordance with IFC Drawing 12, Detail 1. <br />Ames resumed construction of the LOB by placing Soil Liner Fill (SLF) and Geomembrane. Ames <br />placed 1 foot of SLF and POLYFLEX deployed 80-mil single sided textured LLDPE gomembrane <br />over an azea of 7,583 sf. Geomembrane panel P-57 through P-61 were deployed, seamed, and tested by <br />POLYFLEX. Destructive seam samples DF-14 and DX-02 were removed and tested. Ames backfilled <br />approximately 135 feet of anchor trench and placed 2 feet of Drain Cover Fill (DCF) over the lined <br />azea. <br />Phase IVc <br />Ames used Structural Fill to backfill "Shallow" workings UG-290, UG-290b, UG-293, UG-295, UG- <br />295b, UG-449, and UG-450. Ames also remove oversized and deleterious material to a designated <br />location in Upper Arequa Gulch or to the uncontrolled fill zone East of Phase Na/b. <br />Ames performed excavation remediation activities for known underground workings UG-261, UG-290, <br />UG-295b, and UG-261. The workings were observed and verified to be "Shallow" or "Deep" as <br />defined in the drawings and will be remediated accordingly. <br />Phue IVe 48 FeL24-Merch9.doc Golder Associates lnc. <br />