My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125881
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:12 PM
Creation date
11/25/2007 2:32:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report Weekly Summary No. 39
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ - Associates <br />March 22nd, 2002 <br />Mr. Ron Roberts <br />Cripple Creek & V ictor Gold Mining Company <br />P.O. Box 191 <br />1280 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />I2E: Summary No. 48: February 24 through March 9, 2002 <br />Cresson Project Phase IVa, b, and c Construction Quality Assurance <br />Deaz Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Na, b, and c Construction <br />Quality Assurance (CQA) services performed for the Cresson Project during the period of February 24`x' <br />through Mazch 9d', 2002. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low temperatures <br />ranged from -12° F to 27° F, and highs ranged from 10° F to 50° F. Snow was recorded on February <br />25d', 26d', March 15`, and 8d', 2002. Weather observations were made on ten days of this fourteen-day <br />reporting period. <br />Construction Svnopsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthwork contractor for the Phase IVa, <br />b, and c construction. Ames conducted Phase Na, b, and c construction activities on nine days of <br />this fourteen-day reporting period (February 25d' through February 28a' and Mazch 4d' through <br />March 8d'). <br />Phase IVa <br />Ames placed Structural Fill (SF) in the Phase Na azea at stations 26+00 through 28+00 of the Perimeter <br />Access Road and above station 6+00 of the 9640 road. Ames conducted slope recontouring in the <br />Phase Na area at the 84-inch headwall and along the diversion channel Structural Fill materials were <br />placed in horizontal lifts typically not exceeding 2 feet in loose thickness. A Caterpillaz CS563C roller <br />provided compactive effort, while a Caterpillaz water wagon provided moisture conditioning when <br />needed or required. <br />Ames resumed SF blast drilling in the Phase Na at "D10 Hill". <br />fL J <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303)985-2080 <br />Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.