Laserfiche WebLink
Phase IV Weekly Summary No. 47 Page 4 <br />003-2203 <br />conducted retests of this material (SFb-OSr and SFb-06r) after it had been amended with course SF. <br />The retests of SF met specifications and test results aze presented in Attachment B. <br />. Golder continued to conduct Conformance Testing of geomembrane being produced by <br />POLYFLEX. Test results on material produced to date indicate passing values with the exception of <br />80-mil LLDPE role number PR-8-02-0019-37 that failed to meet the minimum and average <br />thickness requirements of the specifications. This roll along with roll PR-8-02-0020-37 have been <br />rejected and additional testing has bound the failure. Test results not presented to date aze presented <br />in Attachment B. <br />Meetines <br />CC&V held a Weekly Contractors meeting on February 12~' and February 19`s. Items discussed <br />include Safety, Environmental, Schedule, and CQA. The next weekly meeting will be held on <br />February 26'x, 2002 at 10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment C. <br />Sincerely, <br /> <br />Bob Nichols <br />Resident CQA Monitor <br /> <br />rnn4e rv, a, Femaz3.do~ Golder Associates Inc. <br />