My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE125881
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE125881
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:23:12 PM
Creation date
11/25/2007 2:32:13 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
Permit File
Doc Date
9/3/2002
Doc Name
Certification Report Weekly Summary No. 39
From
Cripple Creek & Victor Gold
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
~ = -Golder <br />L~SSOCIc'1teS <br />January 29`h, 2002 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />1280 State Highway 67 <br />Victor CO 80860 <br />Golder Project No.: 003-2203 <br />RE: Summary No. 45: January 13 through January 26, 2002 <br />Cresson Project Phase IVa, b, and c Construction Quality Assurance <br />Dear Mr. Roberts, <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Na, b, and c Construction <br />Quality Assurance ~CQA) services performed for the Cresson Project during the period of January 13th <br />through January 26 , 2002. <br />The weather during this reporting period was cleaz to cloudy. Approximate daytime low temperatures <br />. ranged from 0° F to 22° F, and highs ranged from 22° F to 45° F. Snow was recorded on January 17s' <br />and 23'x, 2002. Weather observations were made on eleven days of this fourteen-day reporting period. <br />Construction Synopsis <br />Ames Construction Ina (Ames) of Aurora, Colorado is the earthwork contractor for the Phase IVa, <br />b, and c construction. Ames conducted Phase IVa, b, and c construction activities on eleven days of <br />this fourteen-day reporting period (January 14th through January 19th, and January 2155 through <br />January 25`h). <br />Phase Na <br />Ames did not place Structural Fill (SF) in the phase Na area, but continued to conduct slope <br />recontouring at the 9640 access road from station 10+00 through 12+00. Excavated material was <br />hauled to Phase IVb. <br />Ames continued to excavate for the construction of 84-inch CSP between stations 47+00 and 49+00. <br />Ames continued placement of 84-inch CSP and Pipe Bedding Fill (PBF). Ames placed <br />approximately 200 feet of 84-inch CSP and bedded the pipe with PBF and SF in accordance with the <br />standazd detail shown on IFC Drawing 15, detail 8. Ames constructed the thrust block at station <br />48+87 by placing concrete in accordance with IFC Drawing I5, detail 4. <br /> <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303) 980-0450 <br />(303) 985-2080 <br />Golder Associates Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.