Laserfiche WebLink
Phase IV Weekly Summary No. 44 Page 4 003-2203 <br />Laboratory Test Results <br />Golder collected and tested samples of Structural Fill (SFc-02 and SFb-03) and Pipe Bedding Fill <br />(PBFa-O1) from material placed in Phase IV for laboratory testing. Material sampled met <br />specifications and a summary of test results aze presented in Attachment C. <br />Meetines <br />CC&V held a Weekly Contractor meeting on December 17`~ and January 9~'. Items discussed <br />include Safety, Environmental, Schedule, and CQA. The next weekly meeting will be held on <br />January 15~', 2002 at 10:00 AM. <br />Golder Personnel On-Site <br />A summary of all Golder CQA personnel on site during this reporting period is presented in <br />Attachment B. <br />Sincerely, <br />Bob Nichols <br />Resident CQA Monitor <br />Phue 1Va 4a DecblenlZ.doc Golder Associates Inc. <br />