Laserfiche WebLink
4.4.5 STUDIES <br />This subsection has been included in order to provide a common <br />location where pertinent studies or other monitoring conducted on <br />revegetated areas at the mine may be compiled for historic purposes <br />and future use. Appendix 9.4-B has been set aside for the inclusion <br />of interim revegetation monitoring results. Appendix 4.9-C has been <br />set aside for the insertion of the results of phase III revegetation <br />bond release monitoring. Appendix 4.9-D contains the study required <br />by the OSMRE which compared revegetation on topsoil and spoil soil <br />reconstruction materials. Appendix 9.9-E has been designated for <br />the inclusion of interseeding minor revisions. In the future, <br />additional appendices may be created for the inclusion of other <br />pertinent reports or studies at such time that they are generated <br />and their inclusion is deemed appropriate. <br />Renewal 1-3 4.4-24 August IS, 2005 <br />