My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE124505
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE124505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:22:04 PM
Creation date
11/25/2007 12:42:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002111
IBM Index Class Name
Permit File
Doc Date
3/18/2004
Doc Name
Cost Summary
From
CIRCES
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />O5 State :Colorado Permivloorr:m-cvuc-rrr <br />a <br />Task#: <br /> :Mesa <br />nt <br />Co Abbreviation :none <br />Date ; 03/12/2004 y <br />u <br /> Site : Gilsonite Pit Filename : M7 f 1-05a <br />User : SSS <br />or organization name : <br />enc <br />A DMG <br />y <br />g <br />Permit or other job action : New 112c permit <br />i <br />ti er elevation of lake divider berms to 1 foot above wafer <br />L level <br />p <br />on <br />Task descr : <br />ow <br /> <br />: <br /><. < <br />HOURLY EQUIPMENT COST <br />. <br /> <br /> <br />05 <br /> Basic machine :Cat D9R - 9SU Horsepower : <br /> Blade type :Semi-Universal <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 ;3-shank ripper <br /> Data source : (CRGJ <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $51.07 NA <br /> Operating cost/hour ; $97.71 100 <br /> Ripper op. cost/hour ; $2.40 25 <br /> Operator costlhour : $31.83 NA <br /> Total unit cost/hour ; $183.01 Total fleet cosUhour : $183.01 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 16,888 BCY factor : 1.220 volume : 20,603 LCY <br />Source of estimated volume :1-2 berm (10'x50k500), 1-3 berm (14k30k400) <br />Source of estimated swellfaetonCAThandbook , <br />HOURLY PRODUCTION <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,110.5 LCY/hr <br />Material consistency description <br />Cmm~arted li/l or embankment <br />Average push gradient : 7.00 % (neg) <br />Average site altitude : 4,455 feat <br />Material weight : 2,800 Ibs/LCY <br />Weight description <br />Clav-Natural bed <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.203 /LCY <br />Operator skill : 0.75 <br />Material consistency : 0.90 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Jab efficiency : 0.83 <br />Spoil pile : 0.80 <br />Push gradient : 1.16 <br />Altitude : 1.00 <br />Material weight : 0.82 <br />Blade type : 1.00 <br />Net correction : 0.43 <br />Source <br />Adjusted unit production : 901.15 LCY/hr <br />Adjusted fleet production : 901.15 LCYlhr <br />Total job time : 22.86 Hours <br />Total job cost : $4,184 <br />
The URL can be used to link to this page
Your browser does not support the video tag.