My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE124505
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE124505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:22:04 PM
Creation date
11/25/2007 12:42:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002111
IBM Index Class Name
Permit File
Doc Date
3/18/2004
Doc Name
Cost Summary
From
CIRCES
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 06a State :Colorado <br />Date : 03/12/2004 <br />User: SSS <br />County :Mesa <br />Site : Gilsonite Pit <br />Agency or organization name :DMG <br />Permit or otherjob action :New 112c <br />Task description : Spread <br />HOURLY EQUIPMENT COST <br />on Phase 3 slopes <br />Basic machine :Cat D9R - 9SU Horsepower : 405 <br />Blade type :Semi-Universal <br />Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br />Attachment no. 2 :3-shank ripper <br /> Data source : (CRG) <br /> Utllization <br />Cost Breakdown : Ownership cost/hour : $51.07 NA <br />Operating cosUhour : $97.71 100 <br />Ripper op, cosUhour : $0.00 0 <br />Operator cosUhour : $31.83 NA <br />Total unit cost/hour : $180.61 Total fleet cosUhour : $180,61 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,259 LCY factor : NA volume : 2,259 LCY <br />Source of estimated volume :Topsoil remaining after S & E slopes of Phase 1 & 2 are covered <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors ~~ Source ~~~~ <br />Average push distance : 150 feet <br />Unadjusted hourly production : 910.5 LCYIhr <br />Material consistency description <br />Partly consolidated stockpile <br />Average push gradient : 15.00 % (r <br />Average site altitude : 9,455 feet <br />Material weight : 1,600 Ibs/LCY <br />Weight description <br />Top Soil <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.217 /LCY <br />Operator skill : 0.75 <br />Material consistency : 1.10 <br />Dozing method : 1.00 <br />Visibility : 1.00 <br />Job efficiency : 0.83 <br />Spoil pile : 0.70 <br />Push gradient : 1.33 <br />Altitude : 1.00 <br />Material weight : 1.44 <br />Blade type : 1.00 <br />Net correction : 0.92 <br />Adjusted unit production : 833.49 LCY/hr <br />Adjusted fleet production : 833.49 LCY/hr <br />Total job time : 2.71 Hours <br />Total job cost : $490 <br />Permit/job# : M-2002-111 <br />Abbreviation :none <br />Filename : M111-06a <br />
The URL can be used to link to this page
Your browser does not support the video tag.