My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PERMFILE124505
DRMS
>
Back File Migration
>
Permit File
>
300000
>
PERMFILE124505
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 10:22:04 PM
Creation date
11/25/2007 12:42:30 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2002111
IBM Index Class Name
Permit File
Doc Date
3/18/2004
Doc Name
Cost Summary
From
CIRCES
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />PROJECT IDENTIFICATION <br />Task # : 03d <br />Date : 03/12/2004 <br />User: SSS <br />State :Colorado <br />County :Mesa <br />Site : Gi/sonite Pit <br />Agency or organization name :DMG <br />Permit or otherjob action :New 112c per. <br />Task description :$hape and <br />HOURLY EQUIPMENT COST <br />Of <br />Permit/job# : M-2002-111 <br />Abbreviation :none <br />Filename : M111-03a <br />laid Phase 3 hi_ghwall backfill <br />Basic machine :Cat D9R - 9SU <br />Blade type :Semi-Universal <br />Attachment no. 1 :ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 405 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization <br />Cost Breakdown : Ownership cost/hour : $51.07 NA <br />Operating cost/hour : $97.71 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $31.83 NA <br />Total unit cosUhour : $180.61 Total fleet cosUhour : $180.61 <br />.: <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 12,000 LCY factor : NA volume : 12,000 LCY <br />Source of estimated volume :Exhibit L <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br />Average push distance : 50 feet <br />Unadjusted hourly production : 2,110.5 LCY/hr <br />Material•consistencydescviption <br />Loose stockpile <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description <br />Sand and clay -Loose <br />2, 700 Ibs/LCY <br />JOB TIME AND COST <br />Fleet size : 1 Dozers) <br />Unit cost : $0.168 /LCY <br />0.00 % (pos) <br />4.455 feet <br />Operator skill <br />Material consistency <br />Dozing method <br />Visibility <br />Job efficiency <br />Spoil pile <br />Push gradient <br />Altitude <br />Material weight <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />0.75 <br />1.20 <br />1.00 <br />1.00 <br />0.83 <br />0.80 <br />1.00 <br />1.00 <br />0.85 <br />1.00 <br />0.51 <br />1074.00 LCY/hr <br />1,074.00 LCY/hr <br />11.17 Hours <br />
The URL can be used to link to this page
Your browser does not support the video tag.